Shahjadpur–Sundalpur (Sundalpur-2) Evaluation/development Well Drilling Project

• Project Approval : DPP 11 September 2014, Approved by The Ministry
• Project Location : Basurhat, Companigonj, Noakhali, Chittagong
• Implementation Period : From October 2014 to June 2016
• Total Cost : 6,290.00

Construction Of Bapex Bhaban Project

• Project Approval : 26 June 2007, Approved by BAPEX Borde, 12 May 2008, Approved by Petrobangla
• 16 September 2008, Approved by The Department of Energy and Mineral Resources
• Project Location : Plot No.-4, Kawran Bazar, C/A, Dhaka-1215
• Implementation Period : From July 2008 To June 2014 (Revised)
• Estimated Cost (Local Currency) : 7080.00
• Estimated Cost (Foreign Currency) : –
• Total Estimated Cost : 7080.00

Procurement Of Gas Process Plant For Srikail Gas Field

• Project Approval : DPP 28 March 2013, Approved by The Ministry
• Project Location : Muradnagar, Comilla, Chittagong
• Implementation Period : From July 2014 to June 2016
• Estimated Cost (Local Currency) : 1,467.00
• Estimated Cost (Foreign Currency) : 10,200.00
• Total Estimated Cost : 11,667.00

 

Procurement Of Standby Gas Process Plant

• Project Approval : DPP 28 March 2013, Approved by The Ministry
• Project Location : Kasba, Brahmanbaria, Chittagong
• Implementation Period : From September 2012 to June 2015 (Revised)
• Estimated Cost (Local Currency) : 695.00
• Estimated Cost (Foreign Currency) : 3923.00
• Total Estimated Cost : 4618.00

 

Rupganj Oil/gas Exploration Wells Project

• Project Approval : DPP 07 February 2013 Approved by The Ministry
• Project Location : Bapex Bhaban,4 Kawran Bazar, Dhaka-1215
• Implementation Period : From July 2012 to June 2015 (Revised)
• Estimated Cost (Local Currency) : 3716.00
• Estimated Cost (Foreign Currency) : 5984.00
• Total Estimated Cost : 9700.00

 

1500 Hp Rig Procurement Project

• Project Approval : 29 August 2012, Approved by Administrative
• Project Location : Bapex Bhaban,4 Kawran Bazar, Dhaka-1215
• Implementation Period : From July 2012 to December 2014 (Revised)
• Estimated Cost (Local Currency) : 2377.00
• Estimated Cost (Foreign Currency) : 18801.00
• Total Estimated Cost : 21178.00

 

Procurement Of Gas Process Plant For Shahbazpur Field

• Project Approval : 29 August 2012, Approved by Administrative
• Project Location : Char Borhanuddin, Bhola
• Implementation Period : From July 2012 to June 2015 (Revised)
• Estimated Cost (Local Currency) : 1025.00
• Estimated Cost (Foreign Currency) : 8509.00
• Total Estimated Cost : 9534.00

 

Gas Field Development Project Of Bapex (Salda Well# 3, 4 & Fenchugonj Well# 4, 5)

• Project Approval : 05 October 2010, Approved by ECNEC
• Project Location : Salad Gas Field, Kasba, Brahmanbaria , Chittagong and Fenchuganj Gas Field, Kulaura, Moulvibazar, Sylhet
• Implementation Period : From July 2010 to December 2014 (Revised)
• Estimated Cost (Local Currency) : 6534.10
• Estimated Cost (Foreign Currency) : 24029.90
• Total Estimated Cost : 30564.00

 

Mobarakpur Oil/gas Exploration Drilling Project

• Project Approval : 22 February 2006, Approved by ECNEC, 30 March 2010, RDPP Approved by ECNEC
• Project Location : Santhia, Pabna
• Implementation Period : From January 2006 to June 2016
• Estimated Cost (Local Currency) : 2742.00
• Estimated Cost (Foreign Currency) : 6184.00
• Total Estimated Cost : 8926.00

 

Sundolpur Oil/Gas Exploration Well Drilling Project

 

Kapasia Oil/Gas Exploration Well Drilling Project

 

Semutang Gas Field Development Project

 

Operational Capability Strengthening (Rig Procurement) Project

• With a view to enhancing the drilling capability of BAPEX in oil and gas exploration, procurement of a 5000(+) meter AC-AC type deep drilling rig under Operational Capability Strengthening (Rig Procurement) Project was approved by ECNEC in June 2003. However, the RDPP of the project was approved with an amount of Tk. 256.50 crore. The procurement process faced repeated difficulty as several re-tender had to invite due to much higher bid price of the tender. However, after the fifth invitation, the contract was signed with technically and commercially lowest bidder M/S. Sichuan Honghua Petroleum Equipment Co. Ltd., China for rig procurement. The rig and rig accessories were supplied in June 2010 by which Fenchugonj-4 with a depth of 3600 meter was drilled successfully. The Project was successfully completed on 30-06-2012.
 

Upgradation Of Data Centre (Udc) Project

• Upgradation of Data Centre (UDC) is a project under ‘Strengthening Capacity Building Project’ of Petrobangla funded by ADB. The objective of this project is to modernize the Data management system of the Data Centre of BAPEX through transcribing the old data stored in legacy media into high density media. For developing an international standard Data Archive as per ADB’s guidelines, the whole procedure of the project is being accomplished under two packages. For the first package which has already been completed in June, 2011. M/S. DPTS Company Ltd. U.K has been awarded the contract for procurement of equipment, hardware, software and related services necessary for upgradation of the Data Management System of the Data Center of BAPEX. The objective of the second package is procurement of consultancy services for conversion of Magnetic Tape into High Density Media. M/S. Orogenic Resources Sdn. Bhd. Malaysia has been awarded for this service.
 

Srikail Oil/Gas Exploration Well-2 Drilling Project

 

Apprisal Of Gas Fields (3d Seismic On Titas, Bakhrabad, Sylhet, Kailashtilla And Rashidpur) Project

 

Exploration And Production Capacity Building Of Bapex (Epcb) Project

 

Bapex Bhaban Construction Project

 

Sunamgonj-Netrokona (Sunetro) Oil/gas Exploratory Well Drilling Project
Divi WordPress Theme
Visit Us On FacebookVisit Us On TwitterVisit Us On Google Plus