|
DIVISIONS OF BAPEX
GEOLOGICAL DIVISION AT A GLANCE
We provide the following services since 1989.
- To propose areas for Geological and Geophysical survey and location for Drilling of Exploratory, Development and Appraisal wells.
- To prepare Geological Programme for Drilling.
- To formulate methods/ideas for finding out prospective areas and formations for hydrocarbon with the help of Geological, Geophysical, Geochemical and Drilling data.
- To make programme for finalizing perforation intervals for DST & production testing to confirmation of HC.
Exploration Geology
- To carry out the geological survey.
- To collect water, oil and gas samples for analyses.
- To prepare geological field report, various geological diagrams and geological cross-sections of the surveyed area.
- To evaluate geological, geo-chemical and geophysical data for finding prospective area for hydrocarbon and prepare geological maps for identifying prospective structural maps.
- To investigate spot of oil/gas seepage and prepare reports for next steps of investigation.
Basin Study
- To evaluate all geological data, previous well data (if any), geophysical and geochemical data of regional /Basin area and identify the hydrocarbon prospect area for future planning.
- Hydrocarbon prospect evaluation and well proposal for drilling.
- To prepare various regional geological maps with the aim to find out suitable locations for drilling.
- To prepare various subsurface geological maps, sections etc.
- To evaluate geochemical, geological and geophysical data for finding prospective area for hydrocarbon and migration pattern and to prepare Geological maps for identifying prospective structural traps.
- To prepare Basin Model with the help of geological, geophysical, geochemical and Drilling data.
Development Geology
- To collect all Geological, Geophysical, Geochemical data of different structures to prepare drilling programme.
- To prepare "Geological Technical Order (GTO)".
- To evaluate of geological, geophysical and previous well data for correlation and to monitor the well during drilling operation.
- To prepare coring programme for wells.
- To anticipate formation pressure and temperature of subsurface of the proposed new drilling location/area.
- To interpret the anticipated drilling parameters as rock hardness, hole problems, structural dip etc.
- To propose of Formation Integrity Test (FIT) programme for a new well.
- To prepare various subsurface geological maps and sections.
- To make programme for perforation intervals for DST and production testing.
Formation Evaluation & Reservoir Engineering
- To prepare wireline logging programme for the drilliable well.
- To interpret wireline logs.
- To evaluate formations with the interpretation of wire line logs and with different methods.
- To select the zones for DST.
- To prepare reserve estimation report of gas fields.
The following areas are covered by geological survey after forming BAPEX :
- Geological Survey From 1989-2005
- 102 km geological survey in Sitakund Area, season: 2004-2005
- 150 km geological survey in North-East Corner of Block-11, season: 2004-2005
- 102 km geological survey in North-West Corner of Block-11, season: 2003-2004
- No Survey, season: 2002-2003
- No Survey, season: 2001-2002
- No Survey, season: 2000-2001
- No Survey, season: 1999-2000
- No Survey, season: 1998-1999
- No Survey, season: 1997-1998
- No Survey, season: 1996-1997
- 123 km geological Survey in Ulatang Area, season: 1995-1996
- No Survey, season: 1994-1995
- 152 km geological survey in Ulatang Area, season: 1993-1994
- 164 km geological survey in Harargoj Area, season: 1992-1993
- 163 km geological survey in Inani Area, season: 1991-1992
- 150 km geological survey in Nikhanchari Area, season: 1990-1991
- 50 km geological survey in Zatinga Area, season: 1989-1990
|
|