|
DIVISIONS OF BAPEX
GEOPHYSICAL DIVISION AT A GLANCE
Geophysical Division has acquired 3846 line km of seismic data from 1989 to 2005. The data are processed in
Geophysical Data Processing Department and interpreted in Geophysical Interpretation Department under the Division.
Time and depth contour maps are prepared for interpretation. Geological settings are tried to match with the nearby wells of
the delineated structures. Location of exploratory or development wells are suggested from the division. Most onshore part of
the basin is explored seismically by the division, starting from single fold to multifold seismic, also gravity and magnetic data
taking under consideration. The division preserves all internal prepared reports. Coordinates of Geophone Position (GP) and Shot
Position (SP) recorded and filed. SEG-D and SEG-Y format data are also preserved in tape.
The following areas are covered by 2D seismic after forming BAPEX :
- Seismic Data Acquisition, Processing & Interpretation From 1989-2005
- 150 line km seismic survey in Kashimpur Area, 12-fold, season: 1990-1991
- 145 line km seismic survey in Lalmai Area, 12-fold, season: 1990-1991
- 379 line km seismic survey in Rajshahi Area, 12-fold, season: 1991-1992
- 412 line km seismic survey in Lalmai-Rajshahi-Feni Area, 12-fold, season: 1991-1992
- 117 line km seismic survey in Habiganj-Bakhrabad Area, Regional:12-fold, season: 1992-1993
- 84 line km seismic survey in Titas Area, 24-fold, season: 1992-1993
- 111 line km seismic survey in Moulovibazar Area, 24-fold, season: 1992-1993
- 359 line km seismic survey in South-West Delta, 12/24-fold, season: 1993-1994
- 270 line km seismic survey in Tangail-Nagarpur Area, 12-fold, season: 1995-1996
- 292 line km seismic survey in Bhola-Charfason Area, 12/24-fold, season: 1995-1996
- 108 line km seismic survey in Saldanadi & Bakhrabad Area, 30/48-fold, season: 1996-1997
- 160 line km seismic survey in Shariatpur Area, 12/24-fold, season: 1996-1997
- 200 line km seismic survey in Haluaghat prospect, 30-fold in Block-11, season: 2003-2004
- 90 line km seismic survey in Narsingdi prospect, 64-fold in Block-12, season: 2003-2004
- 183 line km seismic survey in Bangora prospect 60-fold, Tullow 1st Phase in Block-9, season: 2001-2002 (BAPEX as a contractor, data acquisition part only)
- 389 line km seismic survey in Bangora-Lalmai-Chandpur prospect (60-fold, Tullow 2nd Phase), in Block-9, 2002-2003 (BAPEX as a contractor, data acquisition part only)
- 90 line km seismic survey in Narsingdi structure, 60-fold, for BGFCL in Block-9, season: 2003-2004 (BAPEX as a contractor: data acquisition, processing and interpretation)
- 21 line km seismic survey in Balarampur prospect, 40-fold, for UNOCAL Bangladesh Ltd. in Block-12, season: 2003-2004 (BAPEX as a contractor, data acquisition part only)
- 437 line km seismic survey in south-eastern corner of Block-11, 30-fold, season: 2004-2005.
Results
- Discovered new structures and suggested well locations: Meghna, Narshingdi, Saldanadi, Shahbazpur, Kashimpur, Lalmai and Srikail Structure.
- Suggested development wells: Habiganj, Bakhrabad & Titas fields.
- Structures, size, shape, faults and channels identified more accurately.
- Contractual Jobs
- Well cellar survey on Lalmai structure for Tullow Bangladesh Ltd., 2004
- Well cellar survey on Bangora structure for Tullow Bangladesh Ltd., 2003
- Control Point Establishment on Chandpur prospect for Tullow Bangladesh Ltd., 2003
- Present Equipments & Softwares:
- Sercel SN-388 acquisition module, 1200 Channels, 24 bit.
- Intelistation Z-Pro with 2D/3D ProMAX Processing software.
- 2D/3D Data acquisition designing Geoland software.
- Trimble RTK 5700 series
- Total Station Set-500 & Set-510 series.
- Sercel (Digital Differential Global Positioning System) DGPS NR102 series.
- PC based Trimble Geomatics Office (TGO) software.
- Swift & Prolink software.
- Seisrefa software.
- Past Activity (before 1989) :
- Before forming BAPEX the division was under Petrobangla. From 1978, the division
started acquiring multifold seismic data. A total of 14,235 line km of 6/12/24-fold
seismic data were recorded, processed and interpreted by the division. Single fold analog
data of 6,642 line km were recorded from 1963-78 under Oil and Gas Development Corporation (OGDC) and then Petrobangla.
|
|